Skip to main content
LVM Series Rocket

LVM-3

Operational

Launch Vehicle Mark-3 (LVM3), formerly GSLV Mk III, is ISRO's heaviest operational launcher. It carries a cryogenic upper stage and was chosen to deploy the Chandrayaan missions, as well as the upcoming crewed Gaganyaan missions.

Quick answer

LVM-3 is an ISRO launch vehicle in the LVM series, first flown on 18 December 2014. It has 3 stages and can carry about 10,000 kg to low Earth orbit and about 4,000 kg to geosynchronous transfer orbit. Status: operational.

LVM-3: key facts

LVM-3: key facts
SeriesLVM
StatusOperational
First flight18 December 2014
Stages3
Height43.5 m
Diameter4 m
Lift-off mass640,000 kg
Payload to LEO10,000 kg
Payload to GTO4,000 kg
Launches7
Successful launches7
Success rate100 %

Interactive Exploded Schematic

Frequently asked questions

What is LVM-3?

LVM-3 is an ISRO launch vehicle in the LVM series, first flown on 18 December 2014. It has 3 stages and can carry about 10,000 kg to low Earth orbit and about 4,000 kg to geosynchronous transfer orbit. Status: operational.

When did LVM-3 first fly?

LVM-3 made its first flight on 18 December 2014.

How many stages does LVM-3 have?

LVM-3 has 3 stages.

What is LVM-3's payload capacity?

10,000 kg to low Earth orbit and 4,000 kg to geosynchronous transfer orbit (listed values).

How many times has LVM-3 flown?

Indian Space Hub lists 7 launches, of which 7 were successful (a 100 % success rate).

How big is LVM-3?

43.5 m tall, 4 m in diameter, 640,000 kg at lift-off.

Which spacecraft has LVM-3 launched?

Spacecraft listed for LVM-3 include Gaganyaan Crew Module, Chandrayaan-3, Gaganyaan Crew Module, GSAT-29, Chandrayaan2, Cartosat-2 Series Satellite.

LVM-3 launch vehicle

Launch Roster Performance

100%Success
First Flight LaunchDecember 18, 2014
Total Mission Runs7
Successful Missions7
Failed Missions0